WARKA, I Gede Putu; HANDAYANI, Teti; ASMINA, Diana. PENGENDALIAN BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG J (IRMA UTAMA) RSU PROVINSI NTB MENGGUNAKAN METODE EARNED VALUE: Cost and Time Control on Construction Project of NTB Province Public Hospital’s J Building (Irna Utama) using Earned Value Method. Spektrum Sipil, [S. l.], v. 2, n. 2, p. 125–136, 2017. Disponível em: https://www.spektrum.unram.ac.id/index.php/Spektrum/article/view/28. Acesso em: 14 may. 2024.