Warka, I. G. P., Handayani, T., & Asmina, D. (2017). PENGENDALIAN BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG J (IRMA UTAMA) RSU PROVINSI NTB MENGGUNAKAN METODE EARNED VALUE: Cost and Time Control on Construction Project of NTB Province Public Hospital’s J Building (Irna Utama) using Earned Value Method. Spektrum Sipil, 2(2), 125–136. Retrieved from https://www.spektrum.unram.ac.id/index.php/Spektrum/article/view/28