1.
Fardila D, Sugian A. ANALISIS PERHITUNGAN HARGA POKOK PRODUKSI BETON READY MIX DENGAN MENGGUNAKAN METODE ACTIVITY BASED COSTING (ABC): Analysis Calculation of the Cost of Production of Ready Mix Concrete Using the Activity Base Costing (ABC) Method. SS [Internet]. 2023 Mar. 22 [cited 2024 Apr. 25];10(1):81-7. Available from: https://www.spektrum.unram.ac.id/index.php/Spektrum/article/view/284