ANALISIS PERHITUNGAN HARGA POKOK PRODUKSI BETON READY MIX DENGAN MENGGUNAKAN METODE ACTIVITY BASED COSTING (ABC)
Analysis Calculation of the Cost of Production of Ready Mix Concrete Using the Activity Base Costing (ABC) Method
DOI:
10.29303/spektrum.v10i1.284Published:
2023-03-22Issue:
Vol. 10 No. 1 (2023): SPEKTRUM SIPILKeywords:
HPP, AHSP, Activiy Based CostingArticles
Downloads
How to Cite
Fardila, D., & Sugian, A. (2023). ANALISIS PERHITUNGAN HARGA POKOK PRODUKSI BETON READY MIX DENGAN MENGGUNAKAN METODE ACTIVITY BASED COSTING (ABC): Analysis Calculation of the Cost of Production of Ready Mix Concrete Using the Activity Base Costing (ABC) Method. Spektrum Sipil, 10(1), 81–87. https://doi.org/10.29303/spektrum.v10i1.284